Introduction
Types of Water Level Logging Instruments
Stand-Alone Data Loggers
Submersible Level Loggers
Remote Telemetry Stations
Integrated Sensor-Loggers
How Water Level Logging Instruments Work
Hydrostatic Pressure Sensing
Pressure to level calculation:
h = P / (rho x g)
where: P = measured pressure (Pa), rho = water density (kg/m3), g = 9.806 m/s2
For fresh water: h (m) = P (kPa) / 9.806
Example: P = 29.4 kPa measured -> h = 29.4 / 9.806 = 3.00 m
Barometric Compensation
Barometric compensation formula:
h_corrected = (P_absolute - P_barometric) / (rho x g)
where: P_absolute = logger measured pressure
P_barometric = concurrent barometric pressure reading
rho = water density
Note: Vented loggers with an open vent tube do not require barometric compensation
Datalogger Configuration Parameters
|
Parameter |
Description |
Typical Range |
Notes |
|
Logging interval |
Time between consecutive measurements |
1 min to 60 min |
Shorter = more data, shorter battery life |
|
Start delay |
Time from activation to first reading |
0 to 24 hours |
Allows logger to equilibrate in well before recording starts |
|
Measurement averaging |
Number of samples averaged per logged value |
1 to 60 |
Averaging reduces noise from short-term fluctuations |
|
Battery type |
Cell or battery chemistry |
AA lithium, AA alkaline, 9V |
Lithium preferred for cold environments and long deployments |
|
Memory capacity |
Number of readings stored |
10,000 to 500,000 |
Check against expected deployment duration |
Key Specifications and What They Mean
Accuracy and Resolution
|
Full Scale Range |
Accuracy (% FS) |
Accuracy (mm) |
Resolution |
|
0-5 m WC |
+/- 0.1% FS |
+/- 5 mm |
1 mm |
|
0-5 m WC |
+/- 0.5% FS |
+/- 25 mm |
2 mm |
|
0-10 m WC |
+/- 0.1% FS |
+/- 10 mm |
2 mm |
|
0-30 m WC |
+/- 0.1% FS |
+/- 30 mm |
3 mm |
|
0-100 m WC |
+/- 0.1% FS |
+/- 100 mm |
10 mm |
Drift
Temperature Effects
Water Density and Salinity
Deployment: Installation and Calibration
Installing a Submersible Level Logger
Lower the logger carefully to the target depth on the suspension cable. Do not let the logger body hit the borehole wall - use a suspension bracket or centraliser to keep the logger centred in the well.
Secure the cable to a reference point at the surface - a wellhead fitting, a fixed post, or a designated anchor point. The cable reference point is the zero reference for all level measurements.
Record the depth of the logger sensor below the reference point. This value is the logger offset - it is entered into the logger software to convert pressure readings to water level.
Measure the water level with a dip meter or weighted tape at the time of logger deployment. Record this reading. The dip meter reading is the calibration reference for the deployment.
Measure the depth from the reference point to the water surface with a dip meter. Enter this value as the initial water level in the logger software.
For vented loggers: route the vent tube continuously upward from the sensor to the logger connector at the surface. The vent tube must not be kinked, pinched, or submerged.
For absolute loggers: deploy a barologger at the surface simultaneously, at a location representative of barometric pressure at the monitoring site.
Dip Meter Calibration
Converting Level to Volume
Data Quality and QA/QC
Identifying Data Problems
|
Pattern |
Likely Cause |
Resolution |
|
Constant reading (no variation) |
Sensor resting on well bottom, cable loose, or sensor failure |
Check sensor depth; verify cable connection; retrieve and test logger |
|
Linear drift over time |
Sensor drift - common in long deployments |
Apply calibration offset from dip meter reference; recalibrate |
|
Step changes in level |
Data gap followed by a sudden offset - often caused by downloading data mid-deployment |
Note the download date; split the record before and after download |
|
Oscillating readings |
Sensor in turbulent zone, flow-induced pressure fluctuations |
Relocate sensor to calmer area; use a stilling well; apply moving-average filter in software |
|
Correlated with atmospheric pressure changes |
Absolute logger not compensated for barometric pressure |
Subtract concurrent barometric pressure reading; deploy barologger |
|
Spikes or dropouts |
Electrical noise, loose connection, or brief power interruption |
Inspect cable and connector; check grounding; apply spike filter in software |
QA/QC Procedure
Deploy a reference measurement (dip meter or staff gauge) at the start and end of each deployment
Download data at regular intervals - do not wait until the end of a long deployment to discover a sensor failure
Plot the raw data as a hydrograph (level versus time) and visually inspect for anomalies before applying any processing
Apply barometric compensation for absolute pressure sensors using concurrent barometric data
Apply calibration offsets from dip meter readings at the start and end of the deployment period
Flag and document any periods of questionable data rather than deleting them - a data gap with an explanation is scientifically valid
Export and archive the raw (unprocessed) data separately from processed and calibrated data
Applications by Sector
Groundwater Monitoring
River and Stream Gauging
Municipal Water Storage
Environmental Research
Maintenance and Battery Management
Battery Life
|
Instrument Type |
Battery Life (typical) |
Factors Affecting Life |
|
Stand-alone logger (1-min interval) |
12-24 months |
Shorter interval reduces life proportionally |
|
Stand-alone logger (60-min interval) |
2-5 years |
Temperature extremes reduce life |
|
Submersible logger (1-min interval) |
6-18 months |
Water temperature; frequency of data download |
|
Submersible logger (60-min interval) |
3-10 years |
Battery type; ambient temperature |
|
Remote telemetry station |
1-5 years |
Transmission frequency; cellular vs WiFi; solar panel capacity |
Memory Management
Readings needed = (deployment days) x (24 hours/day) x (60 / logging interval in minutes)
Example: 90-day deployment at 15-minute interval = 90 x 24 x 4 = 8,640 readings
A logger with 10,000-reading capacity can store this with no problem
A logger with 8,000-reading capacity will start overwriting data on day 84
Calibration and Recertification
Selecting the Right Water Level Logger
|
Selection Criterion |
What to Check |
|
Maximum depth / full scale |
Select a range slightly above the maximum expected water level. A sensor rated at twice the actual depth has half the resolution. |
|
Accuracy requirement |
Define the smallest real level change you need to detect. Choose a logger with accuracy at least three times finer than this. |
|
Logging interval |
Shorter intervals give higher data resolution but reduce battery life and increase data volume. 15-30 min is a good default for most applications. |
|
Deployment duration |
Calculate memory capacity vs deployment period. Check battery life specification against expected duration. |
|
Power availability |
No external power? Battery-powered stand-alone or submersible logger. Solar available? Remote telemetry station is feasible. |
|
Data access |
Need data in real time? Remote telemetry. Can wait for retrieval? Stand-alone logger. Multi-site network? Cloud-hosted telemetry platform. |
|
Barometric reference |
Vented logger: no separate barometric data needed. Absolute logger: must deploy a barologger simultaneously. |
|
Environment |
Submersible rated (IP68)? For boreholes and tanks. Weatherproof rated? For outdoor surface installations. |
|
Calibration |
Annual NIST-traceable recalibration available from the supplier? Required for regulatory compliance and research datasets. |
